厂房维修

鱼塘水池应做好屋顶防水施工方案介绍

标签:鱼塘,水池,做好,屋顶,防水,施工,施工方,方案,介绍 时间:2024年04月30日 阅读318

1施工预备:
1 construction preparation:
(1)施工前应预备好图纸(沈阳塑料托盘),编制屋顶防水工程施工方案,然后由专业技术人员操作人员持证上岗。
(1) should be prepared before the construction drawings, construction scheme of waterproofing system, and professional and technical personnel from the operating personnel certificates.


(2)铺贴屋顶防水层的下层必须按设计施工完毕,并经养护后干燥,含水率不大于9%;下层应平整、牢固网络营销公司,不空鼓开裂、不起大砂。
(2) waterproof layer paving the grassroots must according to the design and construction is completed, and after curing, drying, moisture content is less than 9%; the base layer should be flat and firm, no cracking, no sand.


(3)屋顶防水层施工涂底胶前,应将下层外观清理干净。
(3) the waterproof surface should be cleaned before coating the base.


(4)施工用材料均为易燃,因而应预备好响应的消防器材。

(4) construction materials are flammable, so should be prepared corresponding fire equipment.


2宜用材料:
2 materials should be used:
1施工预备:
1 construction preparation:
(1)施工前应预备好图纸,编制屋顶防水工程施工方案,然后由专业技术人员操作人员持证上岗。
(1) should be prepared before the construction drawings, construction scheme of waterproofing system, and professional and technical personnel from the operating personnel certificates.


(2)铺贴屋顶防水层的下层必须按设计施工完毕,并经养护后干燥,含水率不大于9%;下层应平整、牢固,不空鼓开裂、不起大砂。
(2) waterproof layer paving the grassroots must according to the design and construction is completed, and after curing, drying, moisture content is less than 9%; the base layer should be flat and firm, no cracking, no sand.


(3)屋顶防水层施工涂底胶前,应将下层外观清理干净。
(3) the waterproof surface should be cleaned before coating the base.