冬天屋顶防水施工对温度的要求

标签:冬天,屋顶,防水,施工,温度,要求 时间:2024年04月27日 阅读380

1、气温:最好在5℃以上施工,温度太低容易冷凝,不利涂膜的干燥,且会出现裂纹、水泡等情况;
1, the temperature: the best in the construction of more than 5 degrees Celsius, the temperature is too low easy to condensation, unfavorable film drying, and there will be cracks, blisters, etc.;


2、不能再结冰或上霜的基面上施工,也不要在低于4℃时使用。确实因工期必要必须施工时,可将施工时间安排在晴天好气候的10:0-15:00之间,延续环境温度低于零下4℃时,建议停息施工;

2, can not freeze or frost on the surface of the construction, do not contact the environment within 48 hours when the temperature is less than 4 degrees. Indeed, because of the need for the construction period, the construction time can be arranged in a sunny weather 10:0-15:00,When the ambient temperature is below 4 degrees below zero, it is recommended to suspend construction;


3、不宜在雨雪天施工,新施工的外观固化前不要被雨淋。施工后48小时内(百度搜索引擎优化),仍应避免雨淋、霜冻货0℃以下的长期低温;在空气流通不良或不具备透风条件的情况下(如封闭的矿井或隧道),可采用风扇或鼓风机帮忙透风。
3, not in the rain and snow surface construction, new construction is not cured before the rain. Within 48 hours after construction, should avoid long-term low temperature rain and frost goods 0 DEG C; in the case of poor air circulation or do not have ventilation conditions (such as closed mine or tunnel), can be used to assist the ventilation fan or blower.