标签:屋顶,防水,涂料,施工,重要,要的,步骤,流程 时间:2024年04月26日 阅读281

1、工艺流程 

基层清理→涂刷底面屋顶防水层→阴阳角等复杂部位加筋布施工→涂刷中层屋顶防水层→涂刷外观屋顶防水层→工程质量验收 

1, the process of cleaning the basic level to the bottom surface of the waterproof layer of the Yin and yang angle of the complex parts of the construction of reinforced cloth to brush the middle layer of waterproof layer to the surface of the waterproof layer 


2、施工方法 2, construction method 

 ①下层清理:先用铲刀和笤帚及工具将下层外观的突起物、砂浆或疙瘩等铲除并将尘土杂物清扫干净。 The basic cleaning: first with the shovel and broom and tools will protuberances, grassroots surface mortar or bumps and dust debris clean out. 

 ②涂刷底面屋顶防水层:由专人负责称取材料配制,分别称出配料所用的液料、粉料、水,用手提电动搅拌器搅拌均匀,使其不含有未分解的粉料。 Brushing the bottom surface of the waterproof layer: by the person responsible for the preparation of materials, respectively, said the ingredients used in the liquid material, powder, water, with a hand-held electric mixer mixing evenly, so that it does not contain non decomposed powder. 

 ③用滚刷或油漆刷均匀地涂刷底层,不得漏底,一样平常用量为0.3~0.4kg/㎡。待涂层干固后,才能进行下道工序。 The brush or paint brush evenly bottom, no leakage, the general dosage is 0.3 ~ 0.4kg/ square meters. When the coating is dry, the next process can be carried out. 


3、涂刷JS屋顶防水层 将配制好的屋顶防水涂料均匀涂刷在下层外观,每层涂刷量以0.8~1.0kg/㎡为宜多遍涂刷,直到达到涂膜厚度要求。 

①涂覆时应细致以下事项:若液料有沉淀应随时搅拌均匀; 

②涂覆应尽量均匀,不能有局部沉积,不能过厚或过薄,涂料与下层之间不留有气泡,粘结严实。 

③每层涂覆必须按照规定用量取料,最薄处不低于1.2mm。

④涂层硬化后,立刻进行保温养护,保证涂层潮湿,以防粉化。 

3, JS waterproof paint brushing waterproof layer will be prepared evenly on the surface of the base, brushing per layer to 0.8 ~ 1.0kg/ square meters should be many times before brushing, until it reaches the film thickness requirements. The coating should note the following: if the liquid precipitation should be evenly stirred; the coating should be as uniform as possible, local deposition can not, can not be too thick or too thin, there are bubbles left between the coating and the base, tight bond. The coating must be in accordance with the provisions of the amount of each material, the thinnest of not less than 1.2mm. The coating is hardened after heat curing immediately, ensure the coating to prevent wet powder. 


4、可用时间: 在液料:粉料:水=10:20:0~2,环境温度为20℃的条件下,涂料可用时间约3h。现场环境温度低,可用时间长些;反之短些。已配好的屋顶防水材料过稠硬时,不可再加水拌和使用。 (6)施工部位要求: 根据我方设计,屋面接缝处采用JS复合屋顶防水涂料进行涂刷密封,对于管根、地漏、阴阳角等特别部位采用加筋布进行增强处理。 

4, available time: in the liquid material: Powder: water =10:20:0 ~ 2, the ambient temperature of 20 degrees Celsius, the coating can be used about 3h. Low environmental temperature, available for a long time. With a good waterproof material is too thick, can not be mixed with water. (6) construction site requirements: according to our design, the roof joint using JS composite waterproof paint brushing seal for the special parts of root canal, ditch, yin and yang angle reinforced with fabric reinforcement.


5、质量要求: 屋顶防水层施工完毕后,应认真检查整个工程的各个部分,分外是微弱环节,发现题目,及时修复,涂层不应有裂纹、翘边、鼓泡、分层等征象。 

5, quality requirements: waterproof layer after the completion of the construction, should carefully check the whole project of each part, especially the weak link, found the problem, timely repair, coating should not have cracks, curling, bubbling, layered and so on.